ASBESTOS MANAGEMENT

Asbestos and Lead Based Paint Services can include building inspection; abatement design/specification preparation; assistance in the preparation of on-site exposure monitoring/testing, operation and maintenance plans; and NVLAP bulk sample analysis (NVLAP Lab Code 102075-0).

Prior to building the Bank of America Stadium in Charlotte, S&ME provided asbestos surveys and abatement design for 15 structures that were slated to be demolished.

Read more about our Environmental Services.